7.2.13. Lay-out of the receiving room: The receiving room of the dismembering plant must meet the following conditions:(a) the floor must be waterproof and equipped with a grid opening for the disposal of washing water;
(b) the inside space of the room must be arranged so as to permit, in the event of a sudden stop in treatment operations, the receiving of all raw material or inedible meat delivered to the plant.